Open this link on a larger screen to see the verification queue.
135 works across 1 implementing agency, recommended by 4 members of parliament. No allocation figure is published per district — every rupee below is summed from the works themselves.
The people a district authority actually supervises. Vendor concentration is counted from the payment records: an agency paying almost everything to one vendor is worth a question, not an accusation.
| # | Agency | Works | Completed | Sanctioned | To verify | Avg score | Top vendor |
|---|---|---|---|---|---|---|---|
| 1 | NALGONDA(DISTRICT COLLECTOR NALGONDA) | 135 | 126 | ₹4.29 Cr | 6 | 11.5 | RAMAIAH MEDABOINA 17% of spend · 35 vendors |
Whose funds paid for this district’s works.
| Member | Works | Sanctioned | To verify |
|---|---|---|---|
| Komati Reddy Venkat Reddy BHONGIR | 103 | ₹2.80 Cr | 5 |
| Anil Kumar Yadav Mandadi Sitting Rajya Sabha | 16 | ₹76.40 L | 0 |
| Uttam Kumar Nalamada Reddy NALGONDA | 11 | ₹47.88 L | 1 |
| Ravi Chandra Vaddiraju Sitting Rajya Sabha | 5 | ₹24.64 L | 0 |
Sector read from each work’s description.
| Sector | Works | Sanctioned | To verify |
|---|---|---|---|
| Roads & Paving | 69 | ₹2.82 Cr | 0 |
| Street Lighting | 39 | ₹65.52 L | 5 |
| Drainage & Sanitation | 11 | ₹20.94 L | 0 |
| Water | 4 | ₹9.64 L | 1 |
| Community Buildings | 4 | ₹16.93 L | 0 |
| Equipment & Vehicles | 4 | ₹20.00 L | 0 |
| Boundary & Protection | 2 | ₹6.46 L | 0 |
| Sports | 1 | ₹2.99 L | 0 |
| Education | 1 | ₹5.00 L | 0 |
Ranked by score. Cost is judged against comparable works in this district and sector, so a high cost score means unlike its neighbours — not overpriced.
| Work | Agency | Status | Sanctioned | Delay | Cost vs peers | Score | Band |
|---|---|---|---|---|---|---|---|
| Providing of high mast light 2 nos. at 22th ward at Nalgonda ₹330,461 against a ₹149,779 median for Street Lighting works in NALGONDA (121% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.30 L | — | +121% | 43.9 | MEDIUM |
| Providing of high mast light 2 nos. at 43th ward at Nalgonda ₹330,779 against a ₹149,779 median for Street Lighting works in NALGONDA (121% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.31 L | — | +121% | 43.9 | MEDIUM |
| Providing of high mast light 2 nos. at 14th ward at Nalgonda ₹330,779 against a ₹149,779 median for Street Lighting works in NALGONDA (121% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.31 L | — | +121% | 42.5 | MEDIUM |
| Providing of high mast light 2 nos. at 25th ward at Nalgonda ₹330,779 against a ₹149,779 median for Street Lighting works in NALGONDA (121% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.31 L | — | +121% | 41.9 | MEDIUM |
| Providing of high mast light 2 nos. at 17th ward at Nalgonda ₹330,779 against a ₹149,779 median for Street Lighting works in NALGONDA (121% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.31 L | — | +121% | 41.0 | MEDIUM |
| Providing Bore Motor in Kalvapally V of Gurrampode Unusual combination of sanctioned amount, delay and spending pattern — flagged by an isolation forest fitted over every work, not by any single figure being out of range | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Recommended | ₹1.00 L | 818 d | -65% | 40.0 | MEDIUM |
| Providing of high mast light 2 no. at 40th ward at Nalgonda ₹330,779 against a ₹149,779 median for Street Lighting works in NALGONDA (121% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.31 L | — | +121% | 36.7 | LOW |
| Laying of CC Road & Drainage work from Velugu peddaramulu h 642 days beyond expected completion | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Recommended | ₹5.00 L | 642 d | +0% | 34.7 | LOW |
| Providing of Solar lights in Vallala (V) of Shaligouraram (M 642 days beyond expected completion | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Recommended | ₹1.50 L | 642 d | +0% | 34.4 | LOW |
| Construction of Retaining wall to Madelaiah Teample Bit-I in Completed work has no photographic documentation on record | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹4.96 L | — | 0% | 26.6 | LOW |
| Providing of 30w LED Street Lights in BC Colony at Koppolu ( ₹399,152 against a ₹149,779 median for Street Lighting works in NALGONDA (166% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.99 L | — | +166% | 25.9 | LOW |
| Providing of 30W LED Street Lights in Various Locations in K ₹365,000 against a ₹149,779 median for Street Lighting works in NALGONDA (144% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹3.65 L | — | +144% | 25.9 | LOW |
| Laying of construction of Toilets and compound wall at mamid ₹498,360 against a ₹200,000 median for Drainage & Sanitation works in NALGONDA (149% above, 14 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹4.98 L | — | +149% | 25.9 | LOW |
| Providing of LED Street Lights in Kattangur (V) ₹299,149 against a ₹149,779 median for Street Lighting works in NALGONDA (100% above, 156 peer works) | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹2.99 L | — | +100% | 25.8 | LOW |
| Laying of CC Road from Tiramdas Pandu (H) to Ganji Neelambar 100% similarity with another nearby work | NALGONDA(DISTRICT COLLECTOR NALGONDA) | Completed | ₹4.71 L | — | -6% | 22.9 | LOW |