Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Installation of eight (8) nos.Solar 1HP Drinking Water syste

Water

West Bengal / BANKURA — BANKURA(DISTRICT MAGISTRATE BANKURA_IDA) · Subhas Sarkar (BANKURA)

Installation of eight (8) nos.Solar 1HP Drinking Water system with 3000L Tank and all accessories. SPV Module/Panel-1200WP

Overall risk score
63/100
Blended from the five components below, each weighted as shown.
MEDIUM

Risk components

Cost100
Delay100
Duplication46
Agency25
Compliance0
Sanctioned
₹34.00 L
Delay
681d
Cost deviation
580%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹3,400,000 against a ₹500,000 median for Water works in BANKURA (580% above, 71 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 681 days beyond expected completionPublished dates
  • 97% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #32148 (sentence-embedding similarity 0.97, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)