Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Installation of three (4) nos. Solar 1HP Drinking Water syst

Water

West Bengal / BANKURA — BANKURA(DISTRICT MAGISTRATE BANKURA_IDA) · Subhas Sarkar (BANKURA)

Installation of three (4) nos. Solar 1HP Drinking Water system with 3000L Tank and all accessories. SPV Module/Panel-1200WP

Overall risk score
71/100
Blended from the five components below, each weighted as shown.
HIGH

Risk components

Cost100
Delay100
Duplication88
Agency25
Compliance0
Sanctioned
₹17.00 L
Delay
680d
Cost deviation
240%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹1,700,000 against a ₹500,000 median for Water works in BANKURA (240% above, 71 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 680 days beyond expected completionPublished dates
  • 99% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #32114 (sentence-embedding similarity 0.99, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)