Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Construction of Artistic Gazebo

Community Buildings

Delhi / EAST — EAST(COMMISSIONER EAST) · Harsh Malhotra (EAST DELHI)

Overall risk score
42/100
Blended from the five components below, each weighted as shown.
MEDIUM

Risk components

Cost67
Delay0
Duplication100
Agency36
Compliance0
Sanctioned
₹12.13 L
Delay
0d
Cost deviation
67%
Work status
Completed

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹1,212,765 against a ₹726,674 median for Community Buildings works in EAST (67% above, 20 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #65975 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)