Open this link on a larger screen to see the verification queue.

Bharatiya Janata Party · Age 60 · Post Graduate · 5 terms (Lok Sabha 12, 14, 16, 17, 18)
GONDA · Uttar Pradesh · Lok Sabha · 2 terms on record
Works span 3 districts and 3 implementing agencies. Money figures are the portal’s own per-MP aggregates, so this page can be checked against the Ministry’s.
| Sector | Works | Sanctioned |
|---|---|---|
| Roads & Paving | 149 | ₹9.65 Cr |
| Street Lighting | 2 | ₹21.64 L |
| Religious & Cultural | 1 | ₹10.91 L |
| Sports | 1 | ₹23.50 L |
| Work | District | Sanctioned | Risk |
|---|---|---|---|
No.23 Interlocking work of 400 meters length in the vegeta
| GONDA | ₹23.89 L | MEDIUM 54 |
No.14 Interlocking work in 240 meter length from Sarpanchs
| GONDA | ₹11.67 L | MEDIUM 46 |
No.12 Interlocking work in 200 meter length of paved road
| GONDA | ₹10.32 L | MEDIUM 41 |
No.15 Interlocking work in 200 meters length on the link r
| GONDA | ₹10.24 L | MEDIUM 41 |
No.18 Interlocking work in 200 meter length from Tilak Rams
| GONDA | ₹9.65 L | LOW 39 |
No.24 Earthen Khardanja work in 400 meters length from the
| GONDA | ₹7.90 L | LOW 39 |
No.9 Interlocking work in 150 meters length on the road fr
| GONDA | ₹7.75 L | LOW 39 |
No.19 Interlocking work in 150 meter length on the road go
| GONDA | ₹7.63 L | LOW 39 |
No.3 Interlocking work of 150 meters length on the road lea
| GONDA | ₹7.51 L | LOW 39 |
No.2 150 meter length interlocking work on the road going f
| GONDA | ₹7.26 L | LOW 39 |