Open this link on a larger screen to see the verification queue.
291 works across 1 implementing agency, recommended by 5 members of parliament. No allocation figure is published per district — every rupee below is summed from the works themselves.
The people a district authority actually supervises. Vendor concentration is counted from the payment records: an agency paying almost everything to one vendor is worth a question, not an accusation.
| # | Agency | Works | Completed | Sanctioned | To verify | Avg score | Top vendor |
|---|---|---|---|---|---|---|---|
| 1 | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | 291 | 159 | ₹21.02 Cr | 8 | 10.8 | QUALITTY ENTERPRISES 28% of spend · 55 vendors |
Whose funds paid for this district’s works.
| Member | Works | Sanctioned | To verify |
|---|---|---|---|
| K E Prakash ERODE | 194 | ₹9.32 Cr | 1 |
| Subbarayan K TIRUPPUR | 64 | ₹8.21 Cr | 1 |
| Raja A NILGIRIS | 27 | ₹2.31 Cr | 2 |
| I.S. Inbadurai Sitting Rajya Sabha | 5 | ₹1.00 Cr | 4 |
| P. Wilson Sitting Rajya Sabha | 1 | ₹18.50 L | 0 |
Sector read from each work’s description.
| Sector | Works | Sanctioned | To verify |
|---|---|---|---|
| Education | 111 | ₹3.97 Cr | 3 |
| Street Lighting | 69 | ₹3.34 Cr | 0 |
| Roads & Paving | 36 | ₹4.00 Cr | 4 |
| Community Buildings | 35 | ₹5.57 Cr | 1 |
| Water | 15 | ₹1.68 Cr | 0 |
| Drainage & Sanitation | 8 | ₹80.50 L | 0 |
| Other | 4 | ₹48.60 L | 0 |
| Boundary & Protection | 4 | ₹40.60 L | 0 |
| Religious & Cultural | 3 | ₹34.50 L | 0 |
| Equipment & Vehicles | 3 | ₹25.25 L | 0 |
Ranked by score. Cost is judged against comparable works in this district and sector, so a high cost score means unlike its neighbours — not overpriced.
| Work | Agency | Status | Sanctioned | Delay | Cost vs peers | Score | Band |
|---|---|---|---|---|---|---|---|
| Construction of Anganvadi Building at Thiruvalluvar Thindal ₹1,400,000 against a ₹200,000 median for Education works in ERODE (600% above, 121 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹14.00 L | 365 d | +600% | 50.5 | MEDIUM |
| Construction of Anganvadi Building at Weekly Market area War ₹1,400,000 against a ₹200,000 median for Education works in ERODE (600% above, 121 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹14.00 L | 365 d | +600% | 50.5 | MEDIUM |
| Construction of Bridge across the Odai from syphon at mile 5 ₹2,500,000 against a ₹1,100,000 median for Roads & Paving works in ERODE (127% above, 81 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹25.00 L | — | +127% | 45.5 | MEDIUM |
| Formation of B.T.Road in Left side Bund of Kalingarayan Chan ₹2,160,000 against a ₹1,100,000 median for Roads & Paving works in ERODE (96% above, 81 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹21.60 L | — | +96% | 44.6 | MEDIUM |
| Formation of B.T.Road in Left side Bund of Kalingarayan Chan ₹2,100,000 against a ₹1,100,000 median for Roads & Paving works in ERODE (91% above, 81 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹21.00 L | — | +91% | 43.2 | MEDIUM |
| Construction of Ground Floor and 1st Floor Community Welfare ₹6,000,000 against a ₹1,230,000 median for Community Buildings works in ERODE (388% above, 55 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹60.00 L | 112 d | +388% | 41.0 | MEDIUM |
| Formation of B.T.Road in Left side Bund of Kalingarayan Chan ₹2,000,000 against a ₹1,100,000 median for Roads & Paving works in ERODE (82% above, 81 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹20.00 L | — | +82% | 41.0 | MEDIUM |
| Providing DESK & BENCH to Kasipalayam Panchayat Union Prima ₹387,500 against a ₹200,000 median for Education works in ERODE (94% above, 121 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹3.88 L | — | +94% | 40.3 | MEDIUM |
| Construction of Passenger Shelter at Selumithottai at Thinga 243 days beyond expected completion | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹6.00 L | 243 d | -51% | 34.3 | LOW |
| Providing Kitchen Room with Dinning Hall for Community Hall ₹2,500,000 against a ₹1,230,000 median for Community Buildings works in ERODE (103% above, 55 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹25.00 L | 45 d | +103% | 31.8 | LOW |
| Providing 40vatt LED light at 15 Wards in Zone 1 (1,2,3,4,6, ₹1,500,000 against a ₹468,000 median for Street Lighting works in ERODE (221% above, 89 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹15.00 L | 45 d | +221% | 31.8 | LOW |
| construction of fair price shop opposite to Kamatchi Amman T 100% similarity with another nearby work | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹18.50 L | — | 0% | 28.7 | LOW |
| Constructions of PDS shop at ward No.1 Ponnatchipudur P.Mett Unusual combination of sanctioned amount, delay and spending pattern — flagged by an isolation forest fitted over every work, not by any single figure being out of range | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹14.50 L | 112 d | +18% | 28.2 | LOW |
| Construction of PDS Shop at Ward No 11 Bhavani Municipality Unusual combination of sanctioned amount, delay and spending pattern — flagged by an isolation forest fitted over every work, not by any single figure being out of range | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹15.00 L | 112 d | +22% | 26.5 | LOW |
| Construction of an Anganwadi center in Sakthi Nagar Colony, ₹1,500,000 against a ₹200,000 median for Education works in ERODE (650% above, 121 peer works) | ERODE(DISTRICT_COLLECTORE_ERODE_IDA) | Recommended | ₹15.00 L | — | +650% | 25.5 | LOW |