ESTIMATE (2020218816) OF BHOPAL MUNICIPAL CORPORATION. ELEC
Street Lighting
Madhya Pradesh / BHOPAL — BHOPAL(DISTRICT COLLECTOR BHOPAL_IDA) · Pragya Singh Thakur (BHOPAL)
ESTIMATE (2020218816) OF BHOPAL MUNICIPAL CORPORATION. ELECTRIFICATION WORK DETAILS:- (1) -V4_13.58_21-Supplying of angle/channel flat iron fit- (2) 3000001217-Piercing connector type-I (3) 3000002029-Dead end clamps (4) 1000005523-S.clamp (5) 1000004966-90watt LED (6) 3000012331-XLPE aerial bunch (7) 1000005515-Automatic timer panel 110A (8) 1000004966-60 watt LED (9) 1000001873-45 watt LED (10) 3000003757- Spring loaded bus bar
Overall risk score
54/100
Blended from the five components below, each weighted as shown.
Risk components
Cost100
Delay100
Duplication0
Agency28
Compliance0
Sanctioned
₹9.98 L
Delay
613d
Cost deviation
422%
Work status
Recommended
AI powered · gemini-flash-liteWhy was this flagged?
- ₹997,883 against a ₹191,162 median for Street Lighting works in BHOPAL (422% above, 48 peer works)Peer comparison · sector labelled by Gemini Flash Lite
- 613 days beyond expected completionPublished dates
Decision trail
Nobody has recorded a decision on this work yet.

