Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Installation of 150 solar light in Unchahar vidhansabha in d

Street Lighting

Uttar Pradesh / RAE BARELI — RAE BARELI(DISTRICT MAGISTRATE RAE BARELI_IDA) · Sanjay Seth (Sitting Rajya Sabha)

Installation of 150 solar light in Unchahar vidhansabha in different villages or blocks

Overall risk score
75/100
Blended from the five components below, each weighted as shown.
HIGH

Risk components

Cost100
Delay100
Duplication100
Agency36
Compliance0
Sanctioned
₹24.98 L
Delay
268d
Cost deviation
13296%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹2,497,625 against a ₹18,644 median for Street Lighting works in RAE BARELI (13296% above, 1438 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 268 days beyond expected completionPublished dates
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #13302 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)