Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Construction of Atal Bhawan Phase-1 at Nazira Town,Ward No-0

Community Buildings

Assam / SIVASAGAR — SIVASAGAR(Deputy Commissioner Sivsagar_IDA) · Jogen Mohan (Sitting Rajya Sabha)

Construction of Atal Bhawan Phase-1 at Nazira Town,Ward No-04

Overall risk score
52/100
Blended from the five components below, each weighted as shown.
MEDIUM

Risk components

Cost100
Delay0
Duplication100
Agency46
Compliance0
Sanctioned
₹30.00 L
Delay
0d
Cost deviation
900%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹3,000,000 against a ₹299,995 median for Community Buildings works in SIVASAGAR (900% above, 73 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)
  • Implementing agency has a 46% delay rate across its projectsStated compliance rule

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #2203 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)