Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Construction of Concrete road from Vrindavan Padi to KIP Can

Roads & Paving

Uttar Pradesh / PATHANAMTHITTA — PATHANAMTHITTA(DISTRICT COLLECTOR PATHANAMTHITTA_IDA) · Kapil Sibal (Sitting Rajya Sabha)

Construction of Concrete road from Vrindavan Padi to KIP Canal Road

Overall risk score
26/100
Blended from the five components below, each weighted as shown.
LOW

Risk components

Cost4
Delay0
Duplication100
Agency29
Compliance0
Sanctioned
₹2.07 L
Delay
0d
Cost deviation
-59%
Work status
Completed

AI powered · gemini-flash-liteWhy was this flagged?

  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #205836 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)