Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

SINGAL PHASE BORING WITH ELECTRICITY CONNECTION WORK NEAR OM

Water

Rajasthan / ALWAR — ALWAR(DISTRICT COLLECTOR ALWAR_IDA) · Ghanshyam Tiwari (Sitting Rajya Sabha)

SINGAL PHASE BORING WITH ELECTRICITY CONNECTION WORK NEAR OMPRAKASH'S HOME, VILLAGE JIRAWALI, GP ALEI, PS-RAJGARH

Overall risk score
47/100
Blended from the five components below, each weighted as shown.
MEDIUM

Risk components

Cost100
Delay0
Duplication100
Agency10
Compliance0
Sanctioned
₹5.54 L
Delay
0d
Cost deviation
439%
Work status
Completed

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹554,381 against a ₹102,944 median for Water works in ALWAR (439% above, 50 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #202220 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)