Construction Library Hall, langar Hall, stage Iron Sheds, m
Education
Haryana / FATEHABAD — FATEHABAD(Deputy Commissioner Fatehabad) · Subhash Barala (Sitting Rajya Sabha)
Construction Library Hall, langar Hall, stage Iron Sheds, main gate
Overall risk score
51/100
Blended from the five components below, each weighted as shown.
Risk components
Cost100
Delay16
Duplication100
Agency17
Compliance0
Sanctioned
₹41.50 L
Delay
28d
Cost deviation
246%
Work status
Recommended
AI powered · gemini-flash-liteWhy was this flagged?
- ₹4,150,000 against a ₹1,200,000 median for Education works in FATEHABAD (246% above, 21 peer works)Peer comparison · sector labelled by Gemini Flash Lite
- 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)
Decision trail
Nobody has recorded a decision on this work yet.
Reads as a near-duplicate of work #9703 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)

