Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Construction Cows shelter in Nand Baba Gau Sewa Sansthan

Community Buildings

Haryana / SIRSA — SIRSA(DEPUTY COMMISSIONER SIRSA_IDA) · Subhash Barala (Sitting Rajya Sabha)

Overall risk score
51/100
Blended from the five components below, each weighted as shown.
MEDIUM

Risk components

Cost100
Delay21
Duplication100
Agency8
Compliance0
Sanctioned
₹11.00 L
Delay
38d
Cost deviation
120%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹1,100,000 against a ₹500,000 median for Community Buildings works in SIRSA (120% above, 47 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #48983 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)