Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Installation of Multi-gym Equipments in School.

Education

Bihar / MUNGER — MUNGER(DISTRICT PLANNING OFFICER MUNGER_IDA) · Arun Bharti (JAMUI)

Overall risk score
46/100
Blended from the five components below, each weighted as shown.
MEDIUM

Risk components

Cost100
Delay0
Duplication100
Agency4
Compliance0
Sanctioned
₹17.00 L
Delay
0d
Cost deviation
1600%
Work status
Completed

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹1,700,000 against a ₹100,000 median for Education works in MUNGER (1600% above, 28 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #210088 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)