Construction of drainage line, pathway and entrance beautifi
Roads & Paving
Maharashtra / MUMBAI — MUMBAI(DISTRICT COLLECTOR MUMBAI CITY_IDA) · Milind Murli Deora (Sitting Rajya Sabha)
Construction of drainage line, pathway and entrance beautification near Praman Residency V.P. Road Girgaon
Overall risk score
50/100
Blended from the five components below, each weighted as shown.
Risk components
Cost33
Delay66
Duplication100
Agency32
Compliance0
Sanctioned
₹9.80 L
Delay
118d
Cost deviation
-55%
Work status
Recommended
AI powered · gemini-flash-liteWhy was this flagged?
- 118 days beyond expected completionPublished dates
- 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)
Decision trail
Nobody has recorded a decision on this work yet.
Reads as a near-duplicate of work #50618 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)

