Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Installation of Drinking water Tubewell

Water

Punjab / HOSHIARPUR — HOSHIARPUR(DEPUTY COMMISSIONER HOSHIARPUR_IDA) · Raj Kumar Chabbewal (HOSHIARPUR)

Overall risk score
63/100
Blended from the five components below, each weighted as shown.
MEDIUM

Risk components

Cost100
Delay67
Duplication100
Agency10
Compliance0
Sanctioned
₹9.45 L
Delay
121d
Cost deviation
181%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹945,000 against a ₹336,300 median for Water works in HOSHIARPUR (181% above, 103 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 121 days beyond expected completionPublished dates
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #224453 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)