Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Construction of Phytoremediation Treatment system at Sanjeev

Drainage & Sanitation

Puducherry / PUDUCHERRY — Puducherry(PROJECT DIRECTOR RDA PUDUCHERRY_IDA) · S. Selvaganabathy (Sitting Rajya Sabha)

Construction of Phytoremediation Treatment system at Sanjeevi nagar in Kalapet Assembly constituency

Overall risk score
75/100
Blended from the five components below, each weighted as shown.
HIGH

Risk components

Cost100
Delay100
Duplication100
Agency36
Compliance0
Sanctioned
₹45.00 L
Delay
336d
Cost deviation
188%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹4,500,000 against a ₹1,560,281 median for Drainage & Sanitation works in PUDUCHERRY (188% above, 15 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 336 days beyond expected completionPublished dates
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #13791 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)