Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Construction of community center for the welfare of Halva Sa

Community Buildings

Chhattisgarh / KONDAGAON — KONDAGAON(DISTRICT COLLECTOR KONDAGAON_IDA) · Ranjeet Ranjan (Sitting Rajya Sabha)

Construction of community center for the welfare of Halva Samaj in Village Badedongar Tehsil Pharasgaon District Kondagaon

Overall risk score
75/100
Blended from the five components below, each weighted as shown.
HIGH

Risk components

Cost100
Delay100
Duplication100
Agency33
Compliance0
Sanctioned
₹10.00 L
Delay
350d
Cost deviation
100%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹1,000,000 against a ₹500,000 median for Community Buildings works in KONDAGAON (100% above, 49 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 350 days beyond expected completionPublished dates
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #53184 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)