← Back to worksConstruction of Gully control at No 2 Polashguri village und
Boundary & Protection
Assam / CHIRANG — CHIRANG(Deputy Commissioner Chirang_IDA) · Rwngwra Narzary (Sitting Rajya Sabha)
Construction of Gully control at No 2 Polashguri village under Sidli Dev. Block.
Overall risk score
80/100
Blended from the five components below, each weighted as shown.
HIGHAI powered · gemini-flash-liteWhy was this flagged?
- ₹2,000,000 against a ₹1,000,000 median for Boundary & Protection works in CHIRANG (100% above, 25 peer works)Peer comparison · sector labelled by Gemini Flash Lite
- 241 days beyond expected completionPublished dates
- 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)
- Implementing agency has a 65% delay rate across its projectsStated compliance rule
Decision trail
Nobody has recorded a decision on this work yet.
Reads as a near-duplicate of work #52178 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)