Kasauti can only be opened on a desktop or laptop.

Open this link on a larger screen to see the verification queue.

← Back to works

Construction of rooms and halls in school and colleges.

Education

Uttar Pradesh / LUCKNOW — LUCKNOW(DISTRICT MAGISTRAE LUCKNOW_IDA) · Brij Lal (Sitting Rajya Sabha)

Overall risk score
75/100
Blended from the five components below, each weighted as shown.
HIGH

Risk components

Cost100
Delay100
Duplication100
Agency32
Compliance0
Sanctioned
₹50.00 L
Delay
230d
Cost deviation
233%
Work status
Recommended

AI powered · gemini-flash-liteWhy was this flagged?

  • ₹5,000,000 against a ₹1,500,000 median for Education works in LUCKNOW (233% above, 38 peer works)Peer comparison · sector labelled by Gemini Flash Lite
  • 230 days beyond expected completionPublished dates
  • 100% similarity with another nearby workAI · Sentence-BERT embeddings (all-MiniLM-L6-v2)

Decision trail

Nobody has recorded a decision on this work yet.

Reads as a near-duplicate of work #14170 (sentence-embedding similarity 1.00, measured by all-MiniLM-L6-v2 on meaning rather than shared words; two works can legitimately share a description, so this is a prompt to check, not a finding)