Open this link on a larger screen to see the verification queue.

Bharatiya Janata Party · Age 69 · Post Graduate · 6 terms (Lok Sabha 10, 13, 14, 15, 16, 17)
KAISERGANJ · Uttar Pradesh · Lok Sabha
Works span 2 districts and 2 implementing agencies. Money figures are the portal’s own per-MP aggregates, so this page can be checked against the Ministry’s.
| Sector | Works | Sanctioned |
|---|---|---|
| Roads & Paving | 46 | ₹7.11 Cr |
| Education | 3 | ₹15.00 L |
| Street Lighting | 1 | ₹8.10 L |
| Work | District | Sanctioned | Risk |
|---|---|---|---|
Construction work of rubber mold interlocking from Chhedi Ya
| GONDA | ₹17.64 L | MEDIUM 52 |
Construction work of rubber mold interlocking from PWD road
| GONDA | ₹12.82 L | MEDIUM 48 |
S.No. 1 Interlocking work of 230 meters length from Prime Mi
| GONDA | ₹12.03 L | MEDIUM 46 |
S.No. 4 CC construction work in 200 meter length from near B
| BAHRAICH | ₹13.22 L | MEDIUM 43 |
S.No.2 Interlocking work of 150 meter length in Nepalpurwa o
| GONDA | ₹7.66 L | LOW 38 |
S.No. 1 Coating work in 460 meter length from Maroucha Baudr
| BAHRAICH | ₹24.77 L | LOW 28 |
S.No. 2 Interlocking work of 400 meters length from Kohli li
| BAHRAICH | ₹24.61 L | LOW 28 |
S.No. 5 Interlocking work of 366 meters length from Ghazipur
| BAHRAICH | ₹24.93 L | LOW 28 |
S.No. 6 Interlocking work of 400 meters length from Ashram P
| BAHRAICH | ₹24.94 L | LOW 28 |
Construction work of 05 meter RCC culvert (box culvert) from
| BAHRAICH | ₹24.90 L | LOW 28 |