Open this link on a larger screen to see the verification queue.
272 works across 1 implementing agency, recommended by 8 members of parliament. No allocation figure is published per district — every rupee below is summed from the works themselves.
The people a district authority actually supervises. Vendor concentration is counted from the payment records: an agency paying almost everything to one vendor is worth a question, not an accusation.
| # | Agency | Works | Completed | Sanctioned | To verify | Avg score | Top vendor |
|---|---|---|---|---|---|---|---|
| 1 | SALEM(DISTRICT COLLECTOR SALEM_IDA) | 272 | 168 | ₹17.63 Cr | 10 | 17.0 | MUNIAN VENKATESAN 28% of spend · 18 vendors |
Whose funds paid for this district’s works.
| Member | Works | Sanctioned | To verify |
|---|---|---|---|
| Malaiyarasan D KALLAKURICHI | 116 | ₹4.55 Cr | 0 |
| S.R. Sivalingam Sitting Rajya Sabha | 51 | ₹3.44 Cr | 6 |
| I.S. Inbadurai Sitting Rajya Sabha | 27 | ₹1.95 Cr | 1 |
| Mani A DHARAMAPURI | 23 | ₹77.50 L | 0 |
| Matheswaran V S NAMAKKAL | 19 | ₹1.43 Cr | 0 |
| M. Dhanapal Sitting Rajya Sabha | 19 | ₹1.80 Cr | 3 |
| Selvaganapathi T.M. SALEM | 16 | ₹3.54 Cr | 0 |
| S. Kalyanasundaram Sitting Rajya Sabha | 1 | ₹15.00 L | 0 |
Sector read from each work’s description.
| Sector | Works | Sanctioned | To verify |
|---|---|---|---|
| Education | 112 | ₹5.99 Cr | 2 |
| Street Lighting | 96 | ₹4.66 Cr | 4 |
| Water | 19 | ₹1.13 Cr | 1 |
| Roads & Paving | 16 | ₹1.69 Cr | 1 |
| Religious & Cultural | 11 | ₹1.05 Cr | 1 |
| Community Buildings | 7 | ₹1.48 Cr | 0 |
| Drainage & Sanitation | 7 | ₹87.34 L | 1 |
| Health | 1 | ₹9.79 L | 0 |
| Equipment & Vehicles | 1 | ₹9.79 L | 0 |
| Boundary & Protection | 1 | ₹41.70 L | 0 |
Ranked by score. Cost is judged against comparable works in this district and sector, so a high cost score means unlike its neighbours — not overpriced.
| Work | Agency | Status | Sanctioned | Delay | Cost vs peers | Score | Band |
|---|---|---|---|---|---|---|---|
| Construction of Compound Wall and Providing pavar Block Road ₹2,000,000 against a ₹999,509 median for Roads & Paving works in SALEM (100% above, 62 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹20.00 L | — | +100% | 45.5 | MEDIUM |
| Construction of single class room Building in PUE School at ₹2,270,000 against a ₹500,000 median for Education works in SALEM (354% above, 187 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹22.70 L | — | +354% | 45.5 | MEDIUM |
| Construction of an Anganvadi center behind Moopanar Temple, ₹1,750,000 against a ₹750,000 median for Religious & Cultural works in SALEM (133% above, 21 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹17.50 L | — | +133% | 45.5 | MEDIUM |
| Constructionof Public Toilet at Sakthi Nagar, Ward No.15 in ₹2,000,000 against a ₹800,000 median for Drainage & Sanitation works in SALEM (150% above, 16 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹20.00 L | — | +150% | 45.5 | MEDIUM |
| Construction of Stadium at Edappadi Boys Higher Secondary Sc ₹5,000,000 against a ₹500,000 median for Education works in SALEM (900% above, 187 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹50.00 L | — | +900% | 45.5 | MEDIUM |
| Construction of OHT for 10000 liter capacity near ayyargadu ₹1,198,660 against a ₹550,000 median for Water works in SALEM (118% above, 39 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Completed | ₹11.99 L | — | +118% | 45.5 | MEDIUM |
| Supply and Erection of Solar LED Light (12 meters) Pole 150W Completed work has no photographic documentation on record | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Completed | ₹7.50 L | — | +68% | 41.9 | MEDIUM |
| Supply and Erection of Solar LED Light (12 meters) Pole 150W Completed work has no photographic documentation on record | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Completed | ₹7.50 L | — | +68% | 41.9 | MEDIUM |
| Supply and Erection of Solar LED Light 12 meter Pole 150 W L Completed work has no photographic documentation on record | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Completed | ₹7.50 L | — | +68% | 41.9 | MEDIUM |
| Supply and Erection of Solar LED Light 12 meter Pole 150 W L Completed work has no photographic documentation on record | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Completed | ₹7.50 L | — | +68% | 41.9 | MEDIUM |
| Construction of a Bus shelter in Edanganasalai Municipality, ₹2,000,000 against a ₹1,345,890 median for Community Buildings works in SALEM (49% above, 34 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹20.00 L | 178 d | +49% | 39.0 | LOW |
| Salem District Sangakiri Municipality Ward No.18 Anaekalpala Unusual combination of sanctioned amount, delay and spending pattern — flagged by an isolation forest fitted over every work, not by any single figure being out of range | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹15.30 L | 219 d | +14% | 38.1 | LOW |
| Construction of Ration Shop building at Yercaud Town Panchay Unusual combination of sanctioned amount, delay and spending pattern — flagged by an isolation forest fitted over every work, not by any single figure being out of range | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹15.00 L | 215 d | +11% | 38.0 | LOW |
| Installation of a 12-metre-high solar-powered tower LED elec ₹750,000 against a ₹447,636 median for Street Lighting works in SALEM (68% above, 150 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹7.50 L | — | +68% | 37.4 | LOW |
| Installation of a 12-metre solar-powered high-mast LED stree ₹750,000 against a ₹447,636 median for Street Lighting works in SALEM (68% above, 150 peer works) | SALEM(DISTRICT COLLECTOR SALEM_IDA) | Recommended | ₹7.50 L | — | +68% | 37.4 | LOW |